We conducted a load test for the client's newly fabricated Cabin that will be used in the EPCC OF BIOMETHANE ENTRY STATION PHASE 1'19 (BES-COR)project. The Cabin was rigged for testing up to 10.5MT and held for 5 minutes. The test was conducted at the...